High-tech virtual reality space capsule for immersive simulations and training experiences. Designed for advanced aerospace applications with cutting-edge VR technology.

Mixed reality · Model 2567

9-Seat 9D VR cinema — nine riders per cycle

The 9-seat 9D VR cinema seats nine guests in one cabin and runs them through the same film together, with seat motion and in-cabin effects. One cycle serves a whole group, which is the point: nine tickets per run rather than nine separate sales.

This model is built for halls rather than corridors. It stands 3,400 mm high, draws 20 kW over three phases, and arrives in modular sections that are assembled on site without welding — three facts that decide whether a venue can take it.

  • Nine seats, one cycle. A full group loads in a single run.
  • 3,400 mm high. Needs a hall with real clear height.
  • 20 kW, three-phase. Industrial supply, not a wall socket.
Seats9 per cycle
Footprint21.2 m²
Height3,400 mm
Power20 kW, three-phase
Typical venuesFECTheme parkStandalone venue
ISO 9001:2015 · CE · RoHS  |  40+ countries · 600+ venues · 10+ years
Reviewed by LEKE VR product team, Guangzhou · 5 Nov 2026

01 / Overview

What a 9-seat 9D VR cinema is

This is the largest cabin in the range. Nine guests sit together, watch the same film in headsets, and the seat platform moves with the action while the cabin adds wind and surround audio. One run clears nine tickets, which changes the queue: a school group, a birthday party or a corporate booking is served in a single cycle rather than being split across machines.

What separates it from the four and six-seat models is not only capacity. It needs a taller room, a heavier supply and a different installation route, so it belongs in a hall that was planned for a real attraction rather than in a corridor position.

Guests per cycleNine, in one cabin, same film.
Seat motionPlatform movement synchronised with the film.
Cabin effectsWind and multi-channel surround audio.
Footprint21.2 m², excluding the operator aisle and queuing zone.
Envelope5,300 × 4,000 × 3,400 mm.

02 / Watch a session

Nine guests, one run

The clip shows the cabin loading and running a full group: nine guests taking their seats, headsets fitted, the operator selecting a title, then the platform moving under all of them at once. What is worth watching is the loading pattern — with nine seats, the changeover is a small operation in itself, and the interval between groups is what sets how many runs an evening holds.

The cycle runs as follows.

Boarding. Nine guests take their seats and are fitted with headsets.
Title. The operator selects the film for that group, matched to who is on the floor.
Run. The platform moves with the action; wind and audio run inside the cabin.
Exit. Headsets are collected and wiped, and the cabin is cleared.
Next group. Nine new guests board, with a new title already selected.

03 / Power and voltage

20 kW on three phases, and what that changes

The unit draws a rated 20 kW and is designed for three-phase industrial supply. That is a different procurement conversation from the smaller cabins: a single-phase wall circuit will not carry it, and the supply has to be confirmed by an electrician before the position is agreed rather than after delivery.

For export orders the input is multi-tap, covering 110 V, 220 V and 380 V grids, with region-specific cable and plug kits specified at order. In practice that means one hardware specification can serve a buyer in Europe, the Middle East or Latin America without a separate build, and the connectivity kit is packed at the factory rather than sourced locally.

20 kW rated

Three-phase design; a single-phase circuit will not carry it.

110 / 220 / 380 V

Multi-tap input, so one SKU covers different national grids.

Cable and plug kit

Specified by destination at order and packed with the shipment.

Confirmed before order

Your electrician signs off the supply; we supply the load figures.

04 / Height and installation

3,400 mm of height, and a modular build

The envelope is 5,300 mm long, 4,000 mm wide and 3,400 mm high, with roughly 21.2 m² of floor before the operator aisle and the queue are added. The height is the number that eliminates sites: a 3.4 m cabin does not go under a mezzanine, into a plant room or behind a bulkhead, and the delivery route has to clear it as well.

Installation is modular. The unit ships in pre-fabricated sections that are assembled and connected on site, with no welding or cutting required — which matters in a mall where hot work needs permits and a fire watch. Site preparation reduces to a level floor and a confirmed supply, and setup is guided by documentation and remote support.

STEP 01

Send the hall

Floor area, clear height, supply capacity and the delivery route.

STEP 02

We confirm the fit

Envelope, boarding zone, queue depth and voltage configuration.

STEP 03

Order and production

Livery, voltage kit and title selection fixed at order.

STEP 04

Assembly and commissioning

Modular sections assembled on site, calibrated, handed over with training.

Where the ceiling is below 2.2 m, the four-seat unit is the practical option; the six-seat cabin covers the middle ground at 1,850 mm.

05 / Titles

The installed library

More than ten titles ship installed, spanning racing, adventure and exploration, action cinema, and family content. The spread is deliberate: with nine seats per run, a single-intensity library would narrow the audience and leave the cabin half empty at family hours.

Titles are selected at the operator station between runs, so a school group in the morning and an adult group in the evening use the same hardware. Selection and language options are confirmed at the quotation stage.

Specification

Model2567
Dimensions5300 × 4000 × 3400 mm (L × W × H)
Weight2500
Riders9
Footprint21.2
Power20 kW, three-phase; 110 / 220 / 380 V multi-tap
DisplayDEEPOON E4C
Content4+ installed titles: racing, adventure and exploration, action cinema, family
OutputTitle selection at the operator station
CertificationISO 9001:2015 · CE · FCC · RoHS, by model and destination
Lead timeStated on the quotation

06 / Commercial

What the quotation includes

Comparative quotes in this category are rarely like for like, and the difference is usually in the second column. Both lists are given before any figures are compared.

From LEKE VR

  • The cabin in modular sections, the nine-seat motion platform and the harnesses
  • Nine VR headsets and the in-cabin wind and surround audio system
  • The operator station and the installed title library
  • Voltage-specific cable and plug kit for your destination
  • Export packing, documentation and delivery to port
  • Remote video-guided assembly support, calibration and staff training
  • Remote diagnostics and spare parts from our own stock

Budgeted on your side

  • Freight, insurance and import duty to your market
  • Floor preparation, reinforcement or any local building work
  • Three-phase supply installation and its certification, signed off by your electrician
  • Queuing rail, signage and cabin livery artwork

Structural questions remain with your structural engineer and electrical questions with your licensed electrician. We supply the drawings and load data they need.

Quality management is certified to ISO 9001:2015, with CE marking and RoHS and FCC compliance by model and destination. Certificates and test reports are available on request.

Our showroom and factory in Guangzhou can be visited. Projects listed below belong to operators, so access is theirs to grant. If a visit is not practical, we work from your floor plan instead. The rest of the 9D range and the wider catalogue are listed under commercial VR products.

Reviews

What operators say about the 9-seat cinema

Swipe to see more →

3.4 m of height and a three-phase supply rule out more sites than the floor area does. Measure both before anything else.

LEKE VR install team, Guangzhou
★★★★★

Nine seats means a school group clears in one run. We stopped splitting bookings across three machines.

Rashid A., FEC operator, Doha

Modular assembly is the quiet advantage. No welding means no hot-work permit, which is often what delays a mall install by weeks.

LEKE VR product team, Guangzhou
★★★★☆

The cabin dominates the hall, which is what we wanted. Voltage kit arrived matched to our grid without extra sourcing.

Petra N., venue manager, Zagreb

Projects

Solutions we build

Swipe to see more →

More machines

Elsewhere in the range

Swipe to see more →

07 / Questions

Questions operators ask

How many people ride at once?

Nine, in one cabin, all watching the same film.

What clear height does it need?

3,400 mm for the cabin itself, plus clearance along the delivery route. This is the first thing to measure — it rules out mezzanines, plant rooms and bulkheads.

What power supply does it need?

A rated 20 kW on three-phase supply. A single-phase circuit will not carry it, so the supply is confirmed before the position is agreed.

Does it work on different national grids?

Yes. The input is multi-tap for 110 V, 220 V and 380 V, with region-specific cable and plug kits specified at order.

How is it installed?

In pre-fabricated modular sections, assembled and connected on site without welding or cutting. Site preparation is a level floor and a confirmed supply.

What titles are included?

More than ten, covering racing, adventure and exploration, action cinema and family content, selected between runs.

Can the livery be customised?

Yes. Colour and venue branding are set at order.

What support is included?

Remote video-guided assembly, remote diagnostics, video support while staff are on the floor, spare parts from our own stock, and after-sales maintenance.

Next step

Send the hall, not a wish list

Send the floor area, the clear height and the supply capacity you have. The height and the three-phase supply decide whether this cabin fits before any figures are discussed.

LEKE VR · Guangzhou Leke VR Technology Co., Ltd. · Guangzhou, China · contact
Figures come from the build sheet and commissioning records for this model and from our own venues. Maintained by the LEKE VR product team in Guangzhou and revised when a number changes.