Black Friday · 16. November – 2. Dezember12 % Rabatt auf Arena, Kino und Karting – plus 2 zusätzliche Spiele oder ein Kartenpaket.

Guides · LEKE VR

Guides for planning, fitting and running a VR venue

Written by the team that draws the layouts and commissions the machines. Floor area, ceiling height, power, staffing, certificates — the things that decide a site before the equipment list does.

Latest

Recent guides

Industry Insights

VR Trade Shows 2026 & 2027: Buyer’s Calendar | LEKE VR

If you are planning which VR trade shows to attend, here is the short answer. For the rest of 2026,…

Read →
Industry Insights

Laser Tag Arena: How It Works and Where VR Fits

The phrase laser tag arena is used for three quite different things: a venue a family visits, a floor an…

Read →
VR Racing & Karting

Virtual Reality Shooting Range: Layout and Throughput

A virtual reality shooting range and a VR shooting arena get quoted as if they were the same product at…

Read →
VR Cinema & 9D

Virtual Reality Chair: Four Types Explained for Buyers

Search for a virtual reality chair and most of the results are gaming chairs with a headset strapped to someone’s…

Read →
VR Cinema & 9D

What Is 7D Cinema? 5D vs 7D Explained for Buyers

Ask what is 7D cinema and you will get a different answer from every supplier you ask. One will describe…

Read →
Industry Insights

Vetting a VR Game Machine Supplier: 5 Checks, 12 Questions

Search for which 9D VR factory is good and every result is a manufacturer explaining why the answer is itself.…

Read →
Industry Insights

How Many VR Machines Fit in a VR Arcade

Take a 200 m² unit, divide by the 2.46 m² footprint of a self-service kiosk, and the arithmetic says eighty-one…

Read →
Industry Insights

Indoor Amusement Equipment: 8 Phases to Opening Day

Most venue builds fail on order, not on budget. The floor is signed before it is measured. The indoor amusement…

Read →
Industry Insights

50sqm vs 200sqm VR Theme Park Layout: Profit per sqm

Put a 50 m² floor next to a 200 m² floor and the instinct is simple: the bigger one wins.…

Read →

Newer articles appear here automatically. For project write-ups with photographs, floor plans and the machine mix, see delivered venues.

Where to start

Four subjects, in the order operators meet them

01 / SPACE

Fitting a machine into a building

Footprint, clear height, floor loading and the delivery route. Most rejected sites fail on height or on the corridor, not on the floor plan.

Jedes Modell mit Abmessungen und Leistung

02 / MIX

Choosing what goes on the floor

Anchors, throughput units, seated formats and unattended kiosks — and the order a visitor meets them in.

Delivered mixes, by scale

03 / COMPLIANCE

Certificates, power and paperwork

What ISO 9001 covers and what it does not, how conformity documents are issued per market, and what your electrician needs from us.

Was umfasst die Unterstützung?

04 / OPERATION

Running the floor after opening

Staffing ratios, cleaning between guests, content rotation and the maintenance that actually gets done.

Ask a specific question

How these guides are written

What you will find, and what we leave out

What you will find

  • Numbers taken from build sheets: footprint, power draw, weight, capacity.
  • Site constraints stated plainly — ceiling height first, because it rejects more sites than area does.
  • Certificates described per model and destination, not as a blanket claim.
  • What happens to a machine after the third month of operation.

What we leave out

  • Ticket price and footfall: yours to decide, not ours to estimate.
  • Payback periods: they depend on rent and staffing we do not control.
  • Comparison tables built to make a competitor look bad.
  • Anything we cannot show a document for.

Have a question the guides do not answer?

Ask it directly. If it is a subject more operators will hit, it usually becomes the next article.