{"id":5448,"date":"2026-10-22T19:32:21","date_gmt":"2026-10-23T03:32:21","guid":{"rendered":"https:\/\/lekevrexport.com\/?p=5448"},"modified":"2026-10-22T19:32:24","modified_gmt":"2026-10-23T03:32:24","slug":"indoor-amusement-equipment-build-phases","status":"publish","type":"post","link":"https:\/\/lekevrexport.com\/de\/indoor-amusement-equipment-build-phases\/","title":{"rendered":"Freizeitger\u00e4te f\u00fcr den Innenbereich: 8 Phasen bis zur Er\u00f6ffnung"},"content":{"rendered":"<div style=\"max-width:880px !important;margin:0 auto !important;padding:0 4px !important;font-family:'Segoe UI',system-ui,-apple-system,sans-serif !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">\n<div style=\"margin:0 0 28px 0 !important;padding:28px 30px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-left:4px solid #00E5FF !important;border-radius:16px !important;box-shadow:0 16px 48px rgba(0,0,0,0.42) !important;\">\n<p style=\"margin:0 0 14px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">Most venue builds fail on order, not on budget. The floor is signed before it is measured. The <strong style=\"color:#FFFFFF !important;font-weight:700 !important;\">indoor amusement equipment<\/strong> is ordered before the layout is locked. The electrical upgrade is discovered after the machines have shipped. Each of those is a sequencing failure, and each one costs far more to correct than the decision that caused it.<\/p>\n<p style=\"margin:0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">This article sets out the eight phases of an indoor amusement build from deposit to opening day &mdash; and, for each phase, what has to be finished, who is accountable for it, what it blocks, and where projects most often lose time. It deliberately gives no amounts and no day counts: those depend on your landlord, your contractor and the factory queue, and any generic figure would be someone else&#8217;s assumption dressed up as yours.<\/p>\n<\/p><\/div>\n<div style=\"display:flex !important;flex-wrap:wrap !important;gap:16px !important;margin:0 0 30px 0 !important;\">\n<div style=\"flex:1 1 150px !important;min-width:140px !important;padding:22px 18px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-radius:12px !important;text-align:center !important;\">\n<div style=\"font-size:11.5px !important;font-weight:700 !important;letter-spacing:0.09em !important;text-transform:uppercase !important;color:#7A8BA3 !important;margin:0 0 8px 0 !important;\">Phases<\/div>\n<div style=\"font-size:18px !important;font-weight:800 !important;color:#00E5FF !important;line-height:1.3 !important;\">8<\/div>\n<\/p><\/div>\n<div style=\"flex:1 1 150px !important;min-width:140px !important;padding:22px 18px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-radius:12px !important;text-align:center !important;\">\n<div style=\"font-size:11.5px !important;font-weight:700 !important;letter-spacing:0.09em !important;text-transform:uppercase !important;color:#7A8BA3 !important;margin:0 0 8px 0 !important;\">Long-lead items<\/div>\n<div style=\"font-size:18px !important;font-weight:800 !important;color:#00E5FF !important;line-height:1.3 !important;\">3<\/div>\n<\/p><\/div>\n<div style=\"flex:1 1 150px !important;min-width:140px !important;padding:22px 18px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-radius:12px !important;text-align:center !important;\">\n<div style=\"font-size:11.5px !important;font-weight:700 !important;letter-spacing:0.09em !important;text-transform:uppercase !important;color:#7A8BA3 !important;margin:0 0 8px 0 !important;\">Parallel tracks<\/div>\n<div style=\"font-size:18px !important;font-weight:800 !important;color:#00E5FF !important;line-height:1.3 !important;\">2<\/div>\n<\/p><\/div>\n<div style=\"flex:1 1 150px !important;min-width:140px !important;padding:22px 18px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-radius:12px !important;text-align:center !important;\">\n<div style=\"font-size:11.5px !important;font-weight:700 !important;letter-spacing:0.09em !important;text-transform:uppercase !important;color:#7A8BA3 !important;margin:0 0 8px 0 !important;\">Amounts quoted<\/div>\n<div style=\"font-size:18px !important;font-weight:800 !important;color:#00E5FF !important;line-height:1.3 !important;\">Keine<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<div style=\"margin:0 0 32px 0 !important;padding:24px 26px !important;background-color:#161B26 !important;border:1px solid rgba(255,255,255,0.08) !important;border-left:3px solid #00E5FF !important;border-radius:16px !important;\">\n<div style=\"font-size:12.5px !important;font-weight:700 !important;letter-spacing:0.08em !important;text-transform:uppercase !important;color:#00E5FF !important;margin:0 0 14px 0 !important;\">What this sequence gives you<\/div>\n<ul style=\"margin:0 !important;padding-left:20px !important;\">\n<li style=\"margin:0 0 9px 0 !important;font-size:15px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">A phase-by-phase handoff table: deliverable, accountable party, what it blocks, and the trap.<\/li>\n<li style=\"margin:0 0 9px 0 !important;font-size:15px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">The three long-lead items that must start first &mdash; and are almost always started last.<\/li>\n<li style=\"margin:0 !important;font-size:15px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">Which phases can genuinely run in parallel, and which cannot be overlapped at all.<\/li>\n<\/ul><\/div>\n<h2 style=\"margin:0 0 18px 0 !important;padding:0 0 15px 0 !important;font-size:28px !important;line-height:1.2 !important;font-weight:800 !important;color:#FFFFFF !important;letter-spacing:-0.7px !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">1. Why the Order Matters More Than the Plan<\/h2>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">A venue build is a chain of handoffs, and every handoff has one party who has to deliver before the next can start. When the chain is respected, the project moves steadily. When it is not, work gets redone &mdash; and rework in a fit-out is the most expensive kind, because it happens after money has been spent twice.<\/p>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">Three rework loops account for most of the pain. Ordering <strong style=\"color:#FFFFFF !important;\">indoor amusement equipment<\/strong> against a catalogue instead of a layout produces machines that do not fit the unit. Committing to a lease before measuring produces a layout that cannot hold the anchor format. Discovering the electrical requirement after installation produces a floor that cannot run at full load.<\/p>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">Each of those is avoided by doing one thing earlier than feels comfortable. That is the entire argument of this article: <strong style=\"color:#FFFFFF !important;\">move the unglamorous steps to the front<\/strong>.<\/p>\n<div style=\"margin:24px 0 !important;padding:18px 22px !important;background-color:#0E1626 !important;border:1px solid rgba(0,229,255,0.3) !important;border-left:3px solid #00E5FF !important;border-radius:12px !important;\">\n<p style=\"margin:0 !important;font-size:15px !important;line-height:1.75 !important;color:#CBD5E1 !important;\"><strong style=\"color:#FFFFFF !important;font-weight:700 !important;\">On dates, deliberately.<\/strong> This article does not give day counts, because the three things that set the calendar are your landlord&#8217;s approval process, your contractor&#8217;s availability and the factory&#8217;s production queue. Ask each of them for their lead time in writing, put those three numbers on one page, and the schedule writes itself. A generic figure sourced from another market is a number that will be wrong in a way you cannot see until it is too late.<\/p>\n<\/p><\/div>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">What this article covers is the axis the planning guides usually skip. If you need the decision framework &mdash; which format, which floor area, how the operating week is structured &mdash; that is a separate question, and it is covered in <a href=\"https:\/\/lekevrexport.com\/vr-arcade-business-how-to-start-formats-costs\/\" style=\"color:#00E5FF !important;text-decoration:none !important;\">our guide to starting a vr arcade business<\/a>. This piece assumes those decisions are made and asks: what happens next, in what order, and who owes you what.<\/p>\n<h2 style=\"margin:44px 0 18px 0 !important;padding:0 0 15px 0 !important;font-size:28px !important;line-height:1.2 !important;font-weight:800 !important;color:#FFFFFF !important;letter-spacing:-0.7px !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">2. The Eight Phases at a Glance<\/h2>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">One row per phase of an indoor amusement equipment build. The right-hand column is the phase it holds up &mdash; the one that cannot start until this one is signed off.<\/p>\n<div style=\"overflow-x:auto !important;margin:26px 0 !important;\">\n<div style=\"font-size:12.5px !important;color:#7A8BA3 !important;margin:0 0 8px 0 !important;\">Bitte scrollen Sie, um alle Spalten anzuzeigen \u2192<\/div>\n<table style=\"width:100% !important;min-width:520px !important;border-collapse:collapse !important;border-spacing:0 !important;\">\n<thead>\n<tr>\n<th style=\"padding:13px 16px !important;font-size:14px !important;font-weight:700 !important;text-align:left !important;background-color:#1E293B !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;\">Phase<\/th>\n<th style=\"padding:13px 16px !important;font-size:14px !important;font-weight:700 !important;text-align:left !important;background-color:#1E293B !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;\">Accountable<\/th>\n<th style=\"padding:13px 16px !important;font-size:14px !important;font-weight:700 !important;text-align:left !important;background-color:#1E293B !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;\">Blocks<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#FFFFFF !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\"><strong style=\"color:#FFFFFF !important;\">1. Site verification<\/strong><\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">You<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Everything downstream<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#FFFFFF !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\"><strong style=\"color:#FFFFFF !important;\">2. Lease and consents<\/strong><\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">You + landlord<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Building works, equipment order<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#FFFFFF !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\"><strong style=\"color:#FFFFFF !important;\">3. Layout and equipment lock<\/strong><\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">You + supplier design<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Electrical scope, production order<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#FFFFFF !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\"><strong style=\"color:#FFFFFF !important;\">4. Building services<\/strong><\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Contractor + electrician<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Commissioning<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#FFFFFF !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\"><strong style=\"color:#FFFFFF !important;\">5. Fit-out<\/strong><\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Fit-out contractor<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Installation access<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#FFFFFF !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\"><strong style=\"color:#FFFFFF !important;\">6. Production and shipping<\/strong><\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Supplier + forwarder<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Installation<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#FFFFFF !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\"><strong style=\"color:#FFFFFF !important;\">7. Installation and commissioning<\/strong><\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Installer + supplier guidance<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Training and trial<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#FFFFFF !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\"><strong style=\"color:#FFFFFF !important;\">8. Staff, trial, opening<\/strong><\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">You<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#94A3B8 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Opening day<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<figure style=\"margin:26px 0 !important;padding:12px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-radius:16px !important;\">\n    <img src=\"https:\/\/lekevrexport.com\/wp-content\/uploads\/Indoor-Amusement-Equipment-Eight-Phase-Venue-Build-Sequence.png\" alt=\"Indoor amusement equipment build sequence in eight phases, with three long-lead items starting before their phase\" loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"1000\" style=\"width:100% !important;height:auto !important;display:block !important;border-radius:12px !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0A0F1D !important;\"><figcaption style=\"margin:12px 6px 2px 6px !important;font-size:13.5px !important;line-height:1.7 !important;color:#7A8BA3 !important;\">Bar length shows sequence position, not duration. The dashed marker is the layout lock &mdash; the moment two of the three long-lead items can finally be started.<\/figcaption><\/figure>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">Two of these rows are wrong if you read them strictly top-to-bottom. Production and shipping starts long before phase 6, and the electrical scope starts before phase 4. Both are covered in section 11 &mdash; but the table is still the right mental model, because each phase&#8217;s <em>acceptance<\/em> genuinely gates the next one.<\/p>\n<h2 style=\"margin:44px 0 18px 0 !important;padding:0 0 15px 0 !important;font-size:28px !important;line-height:1.2 !important;font-weight:800 !important;color:#FFFFFF !important;letter-spacing:-0.7px !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">3. Phase 1 &mdash; Site Verification<\/h2>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">No indoor amusement equipment can be specified until the room has been measured, and this is the one phase that cannot be delegated to a supplier or a landlord. What you record here becomes the input to every drawing that follows.<\/p>\n<div style=\"overflow-x:auto !important;margin:0 0 26px 0 !important;\">\n<table style=\"width:100% !important;min-width:420px !important;border-collapse:collapse !important;border-spacing:0 !important;\">\n<tbody>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;width:170px !important;\">Deliverable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Your own dimensioned drawing, clear height under services, column positions, the landlord&#8217;s supply figure in writing, and the delivery route measured<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Accountable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">You. Not the landlord, not the supplier.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Blocks<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Every other phase. Layout, equipment list and electrical scope all derive from these numbers.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#FF8A6A !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">The trap<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Accepting the landlord&#8217;s marketing plan. A unit advertised at 200 m&sup2; often has columns that remove thirty of them, and the anchor format may need a 54 m&sup2; rectangle that the plan cannot actually give you.<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<h2 style=\"margin:44px 0 18px 0 !important;padding:0 0 15px 0 !important;font-size:28px !important;line-height:1.2 !important;font-weight:800 !important;color:#FFFFFF !important;letter-spacing:-0.7px !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">4. Phase 2 &mdash; Lease and Consents<\/h2>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">Consent for indoor amusement equipment is not the same application as consent for a retail fit-out. Weight, vibration and electrical load all appear in it, and the answers usually sit in the lease schedules rather than the headline terms.<\/p>\n<div style=\"overflow-x:auto !important;margin:0 0 26px 0 !important;\">\n<table style=\"width:100% !important;min-width:420px !important;border-collapse:collapse !important;border-spacing:0 !important;\">\n<tbody>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;width:170px !important;\">Deliverable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Signed lease with permitted use confirmed, a written route for alteration consent, agreed delivery hours, and any vibration, noise or occupancy conditions identified<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Accountable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">You and the landlord; a local authority where alterations require it<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Blocks<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Any building work, and the equipment order &mdash; nobody should order into a unit they might not hold<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#FF8A6A !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">The trap<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">The consent route is usually slower than the commercial negotiation, and it hides in a schedule rather than the main terms. Read the schedules before signing, not after.<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<h2 style=\"margin:44px 0 18px 0 !important;padding:0 0 15px 0 !important;font-size:28px !important;line-height:1.2 !important;font-weight:800 !important;color:#FFFFFF !important;letter-spacing:-0.7px !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">5. Phase 3 &mdash; Layout and Equipment Lock<\/h2>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">This is the phase where <strong style=\"color:#FFFFFF !important;\">indoor amusement equipment<\/strong> stops being a wish list and becomes a schedule of numbers. Every unit needs three figures attached before anything is ordered: footprint, connected load and weight.<\/p>\n<div style=\"overflow-x:auto !important;margin:26px 0 !important;\">\n<table style=\"width:100% !important;min-width:420px !important;border-collapse:collapse !important;border-spacing:0 !important;\">\n<tbody>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;width:170px !important;\">Deliverable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">CAD layout with every unit positioned, and a machine list carrying footprint, connected load and weight per unit<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Accountable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">You, with the supplier&#8217;s design team<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Blocks<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">The electrical schedule and the production order. Both need per-unit figures, not a venue total.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#FF8A6A !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">The trap<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Locking the equipment list before the layout exists. The published spread runs from 2.46 m&sup2; for a self-service kiosk through 16 m&sup2; for a four-player team platform to 54 m&sup2; for a large-format theatre &mdash; and the largest of those will not fit a 50 m&sup2; unit at all.<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<h2 style=\"margin:44px 0 18px 0 !important;padding:0 0 15px 0 !important;font-size:28px !important;line-height:1.2 !important;font-weight:800 !important;color:#FFFFFF !important;letter-spacing:-0.7px !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">6. Phase 4 &mdash; Building Services<\/h2>\n<div style=\"overflow-x:auto !important;margin:0 0 26px 0 !important;\">\n<table style=\"width:100% !important;min-width:420px !important;border-collapse:collapse !important;border-spacing:0 !important;\">\n<tbody>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;width:170px !important;\">Deliverable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Supply confirmed or upgraded, distribution board positioned, floor works complete, ventilation and escape routes signed off, delivery access prepared<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Accountable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Your contractor, a licensed electrician, the landlord, and a structural engineer where the floor is suspended<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Blocks<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Commissioning. A machine cannot be tested where there is no power at its position.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#FF8A6A !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">The trap<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Treating power as a detail. Some <strong style=\"color:#FFFFFF !important;\">indoor amusement equipment<\/strong> requires a dedicated single circuit with the access panel within a short distance of the machine, so the board&#8217;s position is a floor-plan decision. Loads across the range run from about 1 kW to 25.45 kW, and that spread changes the distribution entirely.<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<h2 style=\"margin:44px 0 18px 0 !important;padding:0 0 15px 0 !important;font-size:28px !important;line-height:1.2 !important;font-weight:800 !important;color:#FFFFFF !important;letter-spacing:-0.7px !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">7. Phase 5 &mdash; Fit-Out<\/h2>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">By this phase the indoor amusement equipment is already on order. Fit-out&#8217;s real job is to make sure it can arrive, be carried in, and be switched on where the drawing puts it.<\/p>\n<div style=\"overflow-x:auto !important;margin:0 0 26px 0 !important;\">\n<table style=\"width:100% !important;min-width:420px !important;border-collapse:collapse !important;border-spacing:0 !important;\">\n<tbody>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;width:170px !important;\">Deliverable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Floor finish, ceiling and lighting, signage, counter, storage and a queue area that does not occupy play space<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Accountable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Your fit-out contractor<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Blocks<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Installation access &mdash; heavy units need a clear route and a protected floor<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#FF8A6A !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">The trap<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Finishing before thinking about how the machines get in. Units in this category range from roughly 200 kg to 1,200 kg, and a finished floor plus a tight corner is a combination that damages both.<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<h2 style=\"margin:44px 0 18px 0 !important;padding:0 0 15px 0 !important;font-size:28px !important;line-height:1.2 !important;font-weight:800 !important;color:#FFFFFF !important;letter-spacing:-0.7px !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">8. Phase 6 &mdash; Production and Shipping<\/h2>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">Production is where indoor amusement equipment stops being a drawing and becomes a departure date. Everything you failed to confirm at phase 3 turns into a delay here.<\/p>\n<div style=\"overflow-x:auto !important;margin:0 0 26px 0 !important;\">\n<table style=\"width:100% !important;min-width:420px !important;border-collapse:collapse !important;border-spacing:0 !important;\">\n<tbody>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;width:170px !important;\">Deliverable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Confirmed order with per-unit specifications, a production slot, agreed shipping terms, customs documents in hand, and a delivery slot booked with the landlord<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Accountable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">The supplier for manufacture and packing; a freight forwarder for movement; you for import clearance<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Blocks<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Installation, and therefore the opening date<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#FF8A6A !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">The trap<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Starting the order last, because it is the most exciting step. It is one of the three long-lead items and must be placed as soon as the layout is locked &mdash; running alongside building works, not after them.<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<h2 style=\"margin:44px 0 18px 0 !important;padding:0 0 15px 0 !important;font-size:28px !important;line-height:1.2 !important;font-weight:800 !important;color:#FFFFFF !important;letter-spacing:-0.7px !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">9. Phase 7 &mdash; Installation and Commissioning<\/h2>\n<div style=\"overflow-x:auto !important;margin:0 0 26px 0 !important;\">\n<table style=\"width:100% !important;min-width:420px !important;border-collapse:collapse !important;border-spacing:0 !important;\">\n<tbody>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;width:170px !important;\">Deliverable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Every unit installed, calibrated and running, content loaded, and staff able to operate each one without referring to a manual<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Accountable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Your installer, with remote guidance from the equipment supplier and your electrician on hand<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Blocks<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Training and the trial period<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#FF8A6A !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">The trap<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Treating commissioning as an afternoon. The gap between &ldquo;installed&rdquo; and &ldquo;reliably running&rdquo; is where the problems live, and clearing it needs the machines run under load, not just switched on.<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">LEKE VR provides engineering support online for this phase: maintenance questions and fault diagnosis are handled remotely by engineers, video-call guidance covers installation and commissioning, spare parts are dispatched from the warehouse, and content updates are deployed to the machines remotely. That matters more at commissioning than at any other point, because a configuration fault that takes a week to diagnose by email has already cost you the opening.<\/p>\n<h2 style=\"margin:44px 0 18px 0 !important;padding:0 0 15px 0 !important;font-size:28px !important;line-height:1.2 !important;font-weight:800 !important;color:#FFFFFF !important;letter-spacing:-0.7px !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">10. Phase 8 &mdash; Staff, Trial and Opening<\/h2>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">The floor is finished and the indoor amusement equipment is running. The last phase is about the people who will operate it, and it is the phase most often compressed to protect a launch date.<\/p>\n<div style=\"overflow-x:auto !important;margin:0 0 26px 0 !important;\">\n<table style=\"width:100% !important;min-width:420px !important;border-collapse:collapse !important;border-spacing:0 !important;\">\n<tbody>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;width:170px !important;\">Deliverable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Staff trained on every format, a trial period run with real guests at reduced volume, and the adjustments that trial exposes actually made<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Accountable<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">You<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#00E5FF !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">Blocks<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Opening day &mdash; and the reputation of the first month<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:12px 16px !important;font-size:13.5px !important;font-weight:700 !important;color:#FF8A6A !important;border:1px solid rgba(255,255,255,0.08) !important;background-color:#0E1626 !important;vertical-align:top !important;\">The trap<\/td>\n<td style=\"padding:12px 16px !important;font-size:14.5px !important;color:#CBD5E1 !important;border:1px solid rgba(255,255,255,0.08) !important;vertical-align:top !important;\">Opening on a hard date. A trial week with limited guests finds the queue problem, the format nobody plays and the session that overruns &mdash; while a full-price opening finds them in public.<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<h2 style=\"margin:44px 0 18px 0 !important;padding:0 0 15px 0 !important;font-size:28px !important;line-height:1.2 !important;font-weight:800 !important;color:#FFFFFF !important;letter-spacing:-0.7px !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">11. The Three Long-Lead Items &mdash; Start These First<\/h2>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">Three things in an indoor amusement equipment build take longer than everything else, and each is usually started too late because it does not feel like progress. Put all three in motion as early as the phase order allows.<\/p>\n<div style=\"display:flex !important;flex-wrap:wrap !important;gap:16px !important;margin:26px 0 !important;\">\n<div style=\"flex:1 1 250px !important;min-width:230px !important;padding:22px 20px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-top:3px solid #00E5FF !important;border-radius:12px !important;\">\n<div style=\"font-size:15.5px !important;font-weight:700 !important;color:#FFFFFF !important;margin:0 0 8px 0 !important;line-height:1.35 !important;\">1 &mdash; Alteration consent<\/div>\n<div style=\"font-size:14px !important;line-height:1.7 !important;color:#94A3B8 !important;\">Depends on the landlord and sometimes a local authority. Nothing can be built until it lands, and it is the item most likely to sit in someone&#8217;s inbox.<\/div>\n<\/p><\/div>\n<div style=\"flex:1 1 250px !important;min-width:230px !important;padding:22px 20px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-top:3px solid #00E5FF !important;border-radius:12px !important;\">\n<div style=\"font-size:15.5px !important;font-weight:700 !important;color:#FFFFFF !important;margin:0 0 8px 0 !important;line-height:1.35 !important;\">2 &mdash; Electrical upgrade<\/div>\n<div style=\"font-size:14px !important;line-height:1.7 !important;color:#94A3B8 !important;\">If the unit needs more supply, that work follows landlord approval and a contractor&#8217;s availability. It cannot be compressed by paying for the equipment sooner.<\/div>\n<\/p><\/div>\n<div style=\"flex:1 1 250px !important;min-width:230px !important;padding:22px 20px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-bottom:3px solid #00E5FF !important;border-radius:12px !important;\">\n<div style=\"font-size:15.5px !important;font-weight:700 !important;color:#FFFFFF !important;margin:0 0 8px 0 !important;line-height:1.35 !important;\">3 &mdash; Equipment production and freight<\/div>\n<div style=\"font-size:14px !important;line-height:1.7 !important;color:#94A3B8 !important;\">Once the layout is locked, the order should go in &mdash; even though the floor is still bare. Production and shipping belong beside the building works, not after them.<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<div style=\"margin:24px 0 !important;padding:18px 22px !important;background-color:#0E1626 !important;border:1px solid rgba(0,229,255,0.3) !important;border-left:3px solid #00E5FF !important;border-radius:12px !important;\">\n<p style=\"margin:0 !important;font-size:15px !important;line-height:1.75 !important;color:#CBD5E1 !important;\"><strong style=\"color:#FFFFFF !important;font-weight:700 !important;\">The two parallel tracks.<\/strong> Production runs alongside building works. Staff recruitment and training run alongside fit-out. Everything else in the eight phases is genuinely sequential &mdash; which is why those two overlaps are the only real time savings available in the whole project.<\/p>\n<\/p><\/div>\n<h2 style=\"margin:44px 0 18px 0 !important;padding:0 0 15px 0 !important;font-size:28px !important;line-height:1.2 !important;font-weight:800 !important;color:#FFFFFF !important;letter-spacing:-0.7px !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">12. What to Hand Over at Phase 3<\/h2>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">Everything after phase 3 depends on the quality of that single document. When you brief a supplier on <strong style=\"color:#FFFFFF !important;\">indoor amusement equipment<\/strong> for a real unit, these six inputs turn a quotation into a layout.<\/p>\n<div style=\"margin:24px 0 !important;\">\n<div style=\"display:flex !important;align-items:flex-start !important;gap:14px !important;margin:0 0 12px 0 !important;padding:18px 20px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-radius:12px !important;\">\n<div style=\"flex-shrink:0 !important;width:36px !important;height:36px !important;background-color:#00E5FF !important;border-radius:8px !important;font-size:13px !important;font-weight:800 !important;color:#0A0F1D !important;line-height:36px !important;text-align:center !important;\">1<\/div>\n<div>\n<div style=\"font-size:16px !important;font-weight:700 !important;color:#FFFFFF !important;margin:0 0 5px 0 !important;line-height:1.35 !important;\">Dimensions with columns marked<\/div>\n<div style=\"font-size:14px !important;line-height:1.7 !important;color:#94A3B8 !important;\">A sketch is enough. Mark anything structural that cannot move, because that is what eliminates positions.<\/div>\n<\/div><\/div>\n<div style=\"display:flex !important;align-items:flex-start !important;gap:14px !important;margin:0 0 12px 0 !important;padding:18px 20px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-radius:12px !important;\">\n<div style=\"flex-shrink:0 !important;width:36px !important;height:36px !important;background-color:#00E5FF !important;border-radius:8px !important;font-size:13px !important;font-weight:800 !important;color:#0A0F1D !important;line-height:36px !important;text-align:center !important;\">2<\/div>\n<div>\n<div style=\"font-size:16px !important;font-weight:700 !important;color:#FFFFFF !important;margin:0 0 5px 0 !important;line-height:1.35 !important;\">Clear height under services<\/div>\n<div style=\"font-size:14px !important;line-height:1.7 !important;color:#94A3B8 !important;\">Measured beneath the lowest obstruction. Large-format formats carry published clearances &mdash; the tunnel ride, for instance, is specified with a minimum recommended 3,000 mm.<\/div>\n<\/div><\/div>\n<div style=\"display:flex !important;align-items:flex-start !important;gap:14px !important;margin:0 0 12px 0 !important;padding:18px 20px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-radius:12px !important;\">\n<div style=\"flex-shrink:0 !important;width:36px !important;height:36px !important;background-color:#00E5FF !important;border-radius:8px !important;font-size:13px !important;font-weight:800 !important;color:#0A0F1D !important;line-height:36px !important;text-align:center !important;\">3<\/div>\n<div>\n<div style=\"font-size:16px !important;font-weight:700 !important;color:#FFFFFF !important;margin:0 0 5px 0 !important;line-height:1.35 !important;\">Existing supply capacity<\/div>\n<div style=\"font-size:14px !important;line-height:1.7 !important;color:#94A3B8 !important;\">The landlord&#8217;s figure in writing, and where the distribution board sits relative to the proposed positions.<\/div>\n<\/div><\/div>\n<div style=\"display:flex !important;align-items:flex-start !important;gap:14px !important;margin:0 0 12px 0 !important;padding:18px 20px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-radius:12px !important;\">\n<div style=\"flex-shrink:0 !important;width:36px !important;height:36px !important;background-color:#00E5FF !important;border-radius:8px !important;font-size:13px !important;font-weight:800 !important;color:#0A0F1D !important;line-height:36px !important;text-align:center !important;\">4<\/div>\n<div>\n<div style=\"font-size:16px !important;font-weight:700 !important;color:#FFFFFF !important;margin:0 0 5px 0 !important;line-height:1.35 !important;\">Floor level and structure type<\/div>\n<div style=\"font-size:14px !important;line-height:1.7 !important;color:#94A3B8 !important;\">Ground floor simplifies everything. An upper level brings floor loading and delivery access into the equipment choice itself.<\/div>\n<\/div><\/div>\n<div style=\"display:flex !important;align-items:flex-start !important;gap:14px !important;margin:0 0 12px 0 !important;padding:18px 20px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-radius:12px !important;\">\n<div style=\"flex-shrink:0 !important;width:36px !important;height:36px !important;background-color:#00E5FF !important;border-radius:8px !important;font-size:13px !important;font-weight:800 !important;color:#0A0F1D !important;line-height:36px !important;text-align:center !important;\">5<\/div>\n<div>\n<div style=\"font-size:16px !important;font-weight:700 !important;color:#FFFFFF !important;margin:0 0 5px 0 !important;line-height:1.35 !important;\">Delivery route and hours<\/div>\n<div style=\"font-size:14px !important;line-height:1.7 !important;color:#94A3B8 !important;\">Lift dimensions, rated capacity, door widths, corridor turns. Walk it with a tape rather than trusting a building plan.<\/div>\n<\/div><\/div>\n<div style=\"display:flex !important;align-items:flex-start !important;gap:14px !important;margin:0 !important;padding:18px 20px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-radius:12px !important;\">\n<div style=\"flex-shrink:0 !important;width:36px !important;height:36px !important;background-color:#00E5FF !important;border-radius:8px !important;font-size:13px !important;font-weight:800 !important;color:#0A0F1D !important;line-height:36px !important;text-align:center !important;\">6<\/div>\n<div>\n<div style=\"font-size:16px !important;font-weight:700 !important;color:#FFFFFF !important;margin:0 0 5px 0 !important;line-height:1.35 !important;\">The guest profile you expect<\/div>\n<div style=\"font-size:14px !important;line-height:1.7 !important;color:#94A3B8 !important;\">Pairs, families or groups of ten and up. It decides seat counts and content mix more than floor area does.<\/div>\n<\/div><\/div>\n<\/p><\/div>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">LEKE VR manufactures the equipment and operates its own venues, so layouts are drawn against floors that are trading rather than against a showroom. For a project it produces a CAD plan and a 3D visualization as standard, with a machine list, connected load and weight per unit &mdash; the exact document that phases 4, 5 and 6 all depend on. Machines carry ISO 9001:2015 quality management alongside CE, FCC and RoHS conformity, with testing by T&Uuml;V Rheinland and SGS.<\/p>\n<p style=\"margin:0 0 16px 0 !important;font-size:16px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">A build that runs in this order is unremarkable to watch. Nothing dramatic happens, no work gets redone, and the machines arrive when the floor is ready for them. That is the whole objective: not a faster project, but one that never has to go backwards.<\/p>\n<h2 style=\"margin:44px 0 18px 0 !important;padding:0 0 15px 0 !important;font-size:28px !important;line-height:1.2 !important;font-weight:800 !important;color:#FFFFFF !important;letter-spacing:-0.7px !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">H\u00e4ufig gestellte Fragen<\/h2>\n<div style=\"margin:0 0 26px 0 !important;\">\n<div style=\"padding:18px 0 !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">\n<div style=\"font-size:17px !important;font-weight:750 !important;color:#FFFFFF !important;margin:0 0 9px 0 !important;line-height:1.35 !important;\">In what order should indoor amusement equipment be ordered?<\/div>\n<div style=\"font-size:15px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">Indoor amusement equipment should be ordered after the layout is locked and before the fit-out finishes. The order must follow a drawing that shows every unit positioned on your actual floor, with columns marked &mdash; not a catalogue list. Once that drawing exists, place the order immediately and let production run alongside the building works rather than after them.<\/div>\n<\/p><\/div>\n<div style=\"padding:18px 0 !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">\n<div style=\"font-size:17px !important;font-weight:750 !important;color:#FFFFFF !important;margin:0 0 9px 0 !important;line-height:1.35 !important;\">How long does it take to open a venue?<\/div>\n<div style=\"font-size:15px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">Nobody can answer that for an indoor amusement equipment build from outside your project, because three parties set the calendar: your landlord&#8217;s consent process, your contractor&#8217;s availability, and the factory&#8217;s production queue. Ask each for a lead time in writing, put the three on one page, and you will have a defensible schedule. Published durations usually describe a market and a building type that are not yours.<\/div>\n<\/p><\/div>\n<div style=\"padding:18px 0 !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">\n<div style=\"font-size:17px !important;font-weight:750 !important;color:#FFFFFF !important;margin:0 0 9px 0 !important;line-height:1.35 !important;\">What should be done before signing the lease?<\/div>\n<div style=\"font-size:15px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">Measure the unit yourself, record clear height under services, mark column positions, and get the existing supply figure from the landlord in writing. Those four numbers are the ones any indoor amusement equipment supplier will ask for first. Then confirm that your intended largest format actually fits. A large-format theatre or tunnel ride needs a 54 m&sup2; installation area, which rules out units that look adequate on a marketing plan.<\/div>\n<\/p><\/div>\n<div style=\"padding:18px 0 !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">\n<div style=\"font-size:17px !important;font-weight:750 !important;color:#FFFFFF !important;margin:0 0 9px 0 !important;line-height:1.35 !important;\">Which phases can run at the same time?<\/div>\n<div style=\"font-size:15px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">Two overlaps are genuinely available in an indoor amusement equipment build: equipment production can run alongside building works and fit-out, and staff recruitment and training can run alongside fit-out. Everything else is sequential, because each phase&#8217;s deliverable is a physical precondition for the next one. Trying to parallelise beyond those two usually produces rework rather than time saved.<\/div>\n<\/p><\/div>\n<div style=\"padding:18px 0 !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">\n<div style=\"font-size:17px !important;font-weight:750 !important;color:#FFFFFF !important;margin:0 0 9px 0 !important;line-height:1.35 !important;\">When should the electrical work start?<\/div>\n<div style=\"font-size:15px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">As soon as the layout fixes the connected load per unit for the indoor amusement equipment, because the distribution board&#8217;s position is decided by where the machines sit and how far each access panel may be. Loads across commercial formats range from about 1 kW to 25.45 kW, and some units require a dedicated circuit. Confirm the design with a licensed electrician against local regulations.<\/div>\n<\/p><\/div>\n<div style=\"padding:18px 0 !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">\n<div style=\"font-size:17px !important;font-weight:750 !important;color:#FFFFFF !important;margin:0 0 9px 0 !important;line-height:1.35 !important;\">Do I need structural reinforcement?<\/div>\n<div style=\"font-size:15px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">Less often than expected. Several formats are documented as needing none &mdash; a six-seat cinema distributes 1,200 kg across a base frame and is specified as compatible with standard commercial flooring, a four-seat cinema needs no reinforcement, and a free-roam arena is trackless. Motion platforms are the different question, because they transmit dynamic force as well as weight. On any upper level a structural engineer assesses the actual slab.<\/div>\n<\/p><\/div>\n<div style=\"padding:18px 0 !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">\n<div style=\"font-size:17px !important;font-weight:750 !important;color:#FFFFFF !important;margin:0 0 9px 0 !important;line-height:1.35 !important;\">What is commissioning and why does it need its own phase?<\/div>\n<div style=\"font-size:15px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">It is the period between a machine being installed and a machine running reliably under real load &mdash; calibration, content loading, network checks, and the small faults that only appear when a unit is used continuously. Skipping it moves those faults into your first trading days, when every one of them is visible to a paying guest.<\/div>\n<\/p><\/div>\n<div style=\"padding:18px 0 !important;border-bottom:1px solid rgba(255,255,255,0.08) !important;\">\n<div style=\"font-size:17px !important;font-weight:750 !important;color:#FFFFFF !important;margin:0 0 9px 0 !important;line-height:1.35 !important;\">Why does this article not give a cost table?<\/div>\n<div style=\"font-size:15px !important;line-height:1.75 !important;color:#CBD5E1 !important;\">Because a cost table for indoor amusement equipment is only meaningful with its market, currency, year, scope and floor area attached, and those are rarely published alongside the numbers. Rather than repeat figures we cannot verify for your market, the useful output is the sequence itself plus the per-unit figures a supplier should give you &mdash; footprint, connected load and weight &mdash; so your own quantity surveyor can price it properly.<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<div style=\"margin:48px 0 0 0 !important;padding:56px 32px !important;background-color:#0E1626 !important;border:1px solid rgba(255,255,255,0.08) !important;border-radius:24px !important;text-align:center !important;\">\n<div style=\"font-size:26px !important;font-weight:800 !important;color:#FFFFFF !important;margin:0 0 16px 0 !important;line-height:1.2 !important;letter-spacing:-0.7px !important;\">Start at Phase 3<\/div>\n<p style=\"margin:0 0 32px 0 !important;font-size:16px !important;line-height:1.7 !important;color:#94A3B8 !important;\">Send us the unit dimensions, column positions, clear height under services and the supply figure. We will return a CAD layout and 3D visualization with footprint, connected load and weight per unit &mdash; the document every later phase depends on.<\/p>\n<div style=\"display:flex !important;align-items:center !important;justify-content:center !important;gap:16px !important;flex-wrap:wrap !important;\">\n      <a href=\"https:\/\/lekevrexport.com\/contact\/\" style=\"display:inline-flex !important;align-items:center !important;justify-content:center !important;min-height:50px !important;padding:0 32px !important;background:#00E5FF !important;color:#050A15 !important;font-size:14px !important;font-weight:800 !important;text-transform:uppercase !important;letter-spacing:0.05em !important;text-decoration:none !important;border-radius:999px !important;border:none !important;box-shadow:0 10px 30px rgba(0,229,255,0.28) !important;\">Layout anfordern<\/a><br \/>\n      <a href=\"https:\/\/lekevrexport.com\/solutions\/\" style=\"display:inline-flex !important;align-items:center !important;justify-content:center !important;min-height:50px !important;padding:0 32px !important;background:transparent !important;color:#00E5FF !important;font-size:14px !important;font-weight:800 !important;text-transform:uppercase !important;letter-spacing:0.05em !important;text-decoration:none !important;border-radius:999px !important;border:1.5px solid rgba(0,229,255,0.45) !important;\">See Venue Layouts<\/a>\n    <\/div>\n<\/p><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Most venue builds fail on order, not on budget. The floor is signed before it is measured. The indoor amusement equipment is ordered before the layout is locked. The electrical upgrade is discovered after the machines have shipped. Each of those is a sequencing failure, and each one costs far more to correct than the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5450,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-5448","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-insights"],"acf":[],"_links":{"self":[{"href":"https:\/\/lekevrexport.com\/de\/wp-json\/wp\/v2\/posts\/5448","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lekevrexport.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lekevrexport.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lekevrexport.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lekevrexport.com\/de\/wp-json\/wp\/v2\/comments?post=5448"}],"version-history":[{"count":1,"href":"https:\/\/lekevrexport.com\/de\/wp-json\/wp\/v2\/posts\/5448\/revisions"}],"predecessor-version":[{"id":5451,"href":"https:\/\/lekevrexport.com\/de\/wp-json\/wp\/v2\/posts\/5448\/revisions\/5451"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lekevrexport.com\/de\/wp-json\/wp\/v2\/media\/5450"}],"wp:attachment":[{"href":"https:\/\/lekevrexport.com\/de\/wp-json\/wp\/v2\/media?parent=5448"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lekevrexport.com\/de\/wp-json\/wp\/v2\/categories?post=5448"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lekevrexport.com\/de\/wp-json\/wp\/v2\/tags?post=5448"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}